Peachtree Networks
Tangerang Lab Network Equipment Repair Process

Comprehensive Workflow Documentation

A complete guide to our systematic approach for repairing telecom network equipment, integrated with Orderry management system for efficient tracking and reporting.

Process Overview

Complete Workflow
Customer Request
Orderry Workorder
Diagnostics
Repair Process
Testing
Delivery to Customer
Three Possible Outcomes
PASS
Equipment functions correctly
FAIL
Requires repair process
BER/DAMAGED
Beyond economic repair

Initial Process Flow

1. Received Item for Repair
1
Customer submits repair request with equipment details
2
Create Workorder in Orderry system with unique ticket number
3
Equipment registration and serial number entry in Orderry
4
Initial receipt documentation in system
5
Warehouse availability check for serial number in Orderry
Engineer Assignment
Orderry System Integration:
  • Orderry system assigns Workorder to available Engineer
  • Engineer notification of assignment
  • Serial number verification when available in Warehouse
  • Workorder status update to “Assigned”
  • Engineer accepts assignment and begins process
2. Physical Inspections
1
Comprehensive visual inspection for physical damage
2
Check for burnt components, corrosion, or mechanical damage
3
Verify model numbers, serial numbers, and equipment specifications
4
Document condition with photographs if necessary
5
Initial damage assessment and classification

Testing & Evaluation

3. Test Conducted
1
Power-on test and basic functionality check
2
System initialization and boot sequence verification
3
Interface and connectivity testing
4
Basic parameter verification
Basic Testing Details
1
Component-level testing using specialized test equipment
2
Signal integrity analysis and performance benchmarking
3
Software version verification and compatibility check
4
Basic functionality assessment
4. Test Results Evaluation
Result Classification:
  • PASS: Equipment meets all functional and performance specifications
  • FAIL: Equipment fails critical tests and requires repair
  • BER (Beyond Economic Repair): Repair cost exceeds equipment value
  • DAMAGED/BURNT: Physical damage preventing economical repair
5. Immediate Advice to Customer via Email
Test Results Notification via Orderry:
  • Updated Workorder status in Orderry system
  • Generate automated email notification with test results through Orderry
  • Include repair details and comments
  • Provide timeline for repair completion
  • Notify customer of BER/DAMAGED status (if applicable)

Repair Process (FAIL Items Only)

6. Repair Process
1
Root cause analysis and fault isolation
2
Component failure analysis
3
Documentation of findings in repair database
4
Parts requirement assessment
5
Repair feasibility evaluation
Parts Procurement
1
Generate parts list from diagnosis
2
Check internal inventory availability
3
Procure external parts if needed (lead time consideration)
4
Quality verification of replacement components
5
Parts allocation to repair ticket
Repair Implementation
1
ESD-safe workspace preparation
2
Component replacement/repair execution
3
Software updates and configuration restoration
4
Calibration and alignment procedures
5
Integration testing and verification
7. Testing (Post-Repair Verification)
Comprehensive Testing (After Successful Repair):
  • Full system functionality verification
  • Performance testing against specifications
  • Component-level testing using specialized test equipment
  • Signal integrity analysis and performance benchmarking
  • Software version verification and compatibility check
  • Environmental stress testing if applicable
  • Stress testing under operational conditions
  • Final calibration verification
Quality Control
1
Technical review by senior technician
2
Test results validation
3
Repair documentation completion
4
Quality assurance sign-off
5
Customer acceptance criteria verification

Documentation & Certification

8. Create Cert & Report
Repair Report Generation in Orderry:
  • Complete repair report with all test results in Orderry system
  • Generate test certificates and compliance documentation
  • Create calibration certificates (if applicable)
  • Prepare warranty information and terms
  • Quality assurance documentation compilation in Orderry
Report Contents (Generated by Orderry)
  • Initial Test Results: Complete test data from first evaluation
  • Repair Details: All work performed and parts replaced
  • Final Test Results: Post-repair verification data
  • Performance Comparison: Before and after repair metrics
  • Warranty Terms: Coverage period and conditions
Digital Report Distribution
1
Generate PDF Repair Report from Orderry system
2
Automated email delivery to customer
3
Digital report archival in Orderry
4
Customer portal access for report download
5
Digital signature and certification
9. Label Item
1
Apply repair completion labels with date and technician ID
2
Attach test certificates and documentation
3
Apply warranty labels with expiration dates
4
Update equipment database with repair history
5
QR code generation for tracking (if applicable)

Final Processing & Delivery

10. Move to Repair Good, Cleaning & Packing
1
Professional cleaning of equipment exterior
2
Internal cleaning and dust removal
3
Protective ESD packaging preparation
4
Accessory and cable organization (if supplied with faulty unit)
5
Final quality inspection before packing
Packaging Standards
1
Anti-static packaging for sensitive components
2
Shock-resistant packaging for transport
3
Documentation placement in waterproof envelope
4
Inventory verification against original receipt
5
Package labeling with customer and equipment details
11. Ready to Issue & Delivery
1
Customer completion notification – Email/call informing repair is finished
2
Delivery method confirmation – Customer pickup vs courier delivery
3
Scheduling coordination – Arrange convenient pickup/delivery time
4
Final invoice generation – Prepare billing documentation
5
Delivery documentation preparation – Gather all required paperwork
12. Move BER/Damaged/Burnt Item
1
Secure storage of non-repairable items in designated area
2
Detailed documentation of condition and reason for BER status
3
Customer notification with detailed explanation and photos
4
Disposal recommendations or return preparation options
5
Insurance claim documentation if applicable
13. Ready to Return to Customer
1
Final documentation review in Orderry – ensure completeness
2
Generate final Repair Report in Orderry system with all details
3
Digital distribution of Repair Report to customer email
4
Customer handover scheduling – confirm pickup/delivery appointment
5
Return method coordination – arrange logistics for pickup/delivery
6
Customer acceptance procedure – prepare handover checklist
7
Warranty period activation for repaired items
8
Workorder closure in Orderry system
14. Delivery
1
Equipment handover to customer or courier with proper documentation
2
Delivery confirmation and signature collection for proof of receipt
3
Customer satisfaction survey to gather feedback on repair service
4
Workorder closure in Orderry system with final status update
5
Warranty follow-up scheduling for proactive customer support
For BER/Damaged Items: Similar delivery process but with different documentation explaining the non-repairable status and disposal recommendations

Multiple Units Processing

15. Process Expansion for Additional Units
1
Batch Registration: All units assigned to single batch ticket
2
Parallel Diagnosis: Simultaneous initial assessment of all units
3
Common Issue Identification: Pattern recognition for recurring faults
4
Synchronized Repair: Coordinated repair execution for efficiency
5
Batch Testing: Streamlined quality assurance process
Resource Allocation for Multiple Units
Efficiency Benefits:
  • Technician Assignment: Dedicated team for batch processing
  • Workspace Management: Expanded work area allocation
  • Parts Optimization: Bulk procurement for common components
  • Testing Coordination: Parallel testing setup for multiple units
  • Documentation: Batch reporting with individual unit details
Timeline Adjustment for Additional Units
1
Initial Assessment: +1 day per 5 additional units
2
Repair Execution: +0.5 days per additional unit (parallel processing)
3
Quality Testing: +0.3 days per additional unit
4
Overall Efficiency: 70% time reduction per unit when processing 5+ units

Quality Metrics & KPIs

16. Quality Metrics and KPIs
95%
First-Time Fix Rate
5-7
Business Days Average Repair Time
98%
Customer Satisfaction Target
<2%
Warranty Return Rate
Performance Indicators
  • First-Time Fix Rate: Target 95%
  • Average Repair Time: 5-7 business days
  • Customer Satisfaction: Target 98%
  • Cost Accuracy: ±5% variance from estimate
  • Warranty Return Rate: <2%
Process Improvement
1
Monthly Process Review: Identify bottlenecks and improvements
2
Customer Feedback Integration: Continuous process refinement
3
Technology Updates: Equipment and software capability enhancement
4
Staff Training: Ongoing technical skill development
5
Facility Optimization: Workspace and equipment upgrades

Contact Information

17. Contact Information

Peachtree Networks – Tangerang Repair Lab

Address: Unit 50 Block F BLESSINDO Warehouse and Industrial Complex, Jalan Raya H. Tabri No. 228, Bojong Kamal, Legok District, Tangerang District 15820, Indonesia.
Phone: +62 817-9903-599
Email: services@ptnw.com
Operating Hours: Monday-Friday, 8:00 AM – 5:00 PM WIB
Emergency Contact: Yudith Kurniawan

This document is subject to periodic review and updates based on operational requirements and customer feedback.